Village News

Christmas Lights

Planning

200923 | Cornwall Council votes 63-3 to protest at proposed bonfire of planning controls

Cornwall Council votes 63-3 to protest at proposed bonfire of planning controls

Posted By theboss on 23rd September 2020

By Richard Whitehouse  read more »

200917 | Strong objections to planning changes

Strong objections to planning changes

By Richard Whitehouse Local Democracy Reporter
House building

House building  read more »

200823 | Inside the huge riverside development which aims to transform Hayle forever

The area of Hayle harbour
Simon Wright, CEO of Corinthian Homes
Construction work continues at the North Quay development
Workers are digging two underground car parks
CGI of what Hayle harbour could look like after being transformed
Cannery Row, which will offer waterside townhouses
CGI on how the finished townhouses at North Quay, Hayle, could look

Inside the huge riverside development which aims to transform Hayle forever

The ongoing construction works will turn a brownfield site into a new bustling quarter with waterside homes, restaurants, shops, a gin distillery, a cinema and a hotel  read more »

200901 | Work progressing well in regeneration of North Quay | Hayle Pump

Work is progressing well on the regeneration of North Quay with a number of milestones achieved in recent weeks. North Quay logo

Corinthian Homes started work on site in January and the first block of new quayside townhouses, Cannery Row, has superstructure complete and is on course for the first residents to move in during autumn. We are also busy with major excavations and reinforced concrete work to quaysides in preparation for further development, including the creation of underground car parking and incorporation of tidal defences as part of site-wide flood mitigation measures.
 read more »

200811 | Changes to planning laws which could lower number of affordable homes built in Cornwall by third criticised

Calls for rethink after rule changes put affordable home provision at risk

 read more »

200730 | Approved with conditions | PA18/10457 | Construction of 24 new dwellings, internal shared surface access road

New Planning Application for the yard under the viaduct, opposite ASDA

 

Construction of 24 new dwellings, internal shared surface access road of existing traffic signalled junction and associated parking and infrastructure - Foundry Yard Carnsew Road Hayle

Ref. No: PA18/10457 | Received date: Mon 05 Nov 2018 | Status: Approved with conditions | Case Type: Planning Application

 

[via OCR - you are strongly advised to check the original
http://planning.cornwall.gov.uk/online-applications/files/1575E30E2A384F1C19730C6E46D84D14/pdf/PA18_10457-ACFULZ_-_CONDITIONAL_APPROVAL-5106003.pdf]
 read more »

200730 | New 600-home neighbourhood with primary school to be built in Hayle

Community Consultation 29 June to 10 August 2020 | Hayle Growth Area Concept Plan
Introduction and background | Hayle Growth Area Concept Plan
Concept plan showing layout and uses | Hayle Growth Area Concept Plan
Community Consultation - A 6-week public consultation is running from 29 June to 10 August 2020 | Hayle Growth Area Concept Plan

New 600-home neighbourhood with primary school to be built in Hayle

Construction on the first houses is likley to start in late 2021  read more »

Hayle Growth Area Concept Plan Consultation

Community Consultation 29 June to 10 August 2020 | Hayle Growth Area Concept Plan
Introduction and background | Hayle Growth Area Concept Plan
Concept plan showing layout and uses | Hayle Growth Area Concept Plan
Community Consultation - A 6-week public consultation is running from 29 June to 10 August 2020 | Hayle Growth Area Concept Plan

Community Consultation

 

When
To support the development of the Concept Plan Hayle Town Council and
Cornwall Council would like your input.
A 6-week public consultation is running from
29 June to 10 August 2020.

   read more »

PA20/05161 | Reserved Matters application for construction 377 residential units; 598 sqm retail (Class A1-A5)

Location Map
Character Area
Spine Road
Hitel and Sports Hub
Diverted footpaths
Footbridge location
Key public open space framework principles
Land Use
Key stretch of ‘Linear Waterfront’ connecting the town to the beach  and also two key areas identified within the Design Code - North Quay Entrance Space (3E), North Quay Waterfront Space (3F)
Illustrative Masterplan
Layout - Reserved Matters Area-Stable Block, Eastern Gateway,East Quay And Chieftain’S Yard

PA20/05161 | Reserved Matters application for the construction of 377 residential units; 598 sqm retail (Class A1-A5 and sui generis floorspace; 2,407 sqm of business (Class B1) and industrial and fish storage (Class B2 and B8) floorspace; a 4,409 sqm hotel (Class C1); 2,275 sqm of community and cultural (Class D1) floorpsace and sports and leisure (Class D2) floorspace; and associated access, parking and public open space. The original Outline consent (W1/08-0613) was an environment impact assessment application and an environmental statement was submitted to Cornwall Council at that time. (Details following application no. pursuant to Outline permission PA13/01370).  read more »

Add to calendar
Syndicate content