Village News

Christmas Lights

141010 | Sluicing returns via Hayle Pump

Via http://haylepump.org.uk/documents/haylepump117final.pdf

Sluicing returns

New sluice gates have been fitted to Carnsew Basin in Hayle as part of the plans to resume a sluicing regime, part of the South Quay development by ING.

The sluice pools and sluice gates in Hayle traditionally played a major part in deepening and straightening the navigation channel from the bay into the port of Hayle, and maintained that depth to allow bigger ships and more commerce for the port. This in turn increased the success and wealth of the rival Cornish Copper Company and Harveys of Hayle, which led to greater investment and development of technology and business which helped Hayle play its part in the Industrial Revolution.

The waterways and sluice pools and systems are a large part of the “Overall Universal Value” of Hayle to the World Heritage Area status. It is hoped that sluicing will reduce or replace any need to dredge and sell sand from Hayle.

The idea is that the gates open freely with the pressure of the incoming tide, then swing shut as the tide turns to go out, keeping the water in. Then at the correct time, the smallergates are winched open to allow a strong force of water to sweep sand and sediment out into the bay. Originally hand winched by local harbour employees, the new gates with have the facility to attach a hydraulic device.

Graham Coad

Book page

TitleCreated
2026-EXTENDED-17th April 2026 to 22nd April- Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 2 days 19 hours agoBook page
2026-April-POSTPONED-planned improvements i.e. install footpath, paint double yellow lines junction Grist Lane Hatchs Hill 6 days 8 hours agoBook page
2026 - Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 2 weeks 4 days agoBook page
250330; Closure order:30 Mar-17 Apr 2026; 07:30-17:00; Clearway Parking Zone; Hatchs Hill, Steamers Hill and Angarrack Lane 3 weeks 6 days agoBook page
Traffic/Roads - Marsh/Grist Lane - Traffic counts 2019 onwards 15 weeks 3 days agoBook page
Approved with conditions | PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom... 19 weeks 6 days agoBook page
PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom, covered parking area below | As 20 weeks 5 days agoBook page
251027 | 20mph Monitoring—Hayle & St Ives Speed Data; Phase 3a-May-Jun 24 v Sep-Oct 24; Steamers Hill; Gwinear;Carbis;Nancledra 24 weeks 4 days agoBook page
PA25/07184 | Retention of 4no. existing holiday pods, swimming pool, incidental building, extended driveway and annexe converted 25 weeks 1 day agoBook page
251009 | Stark reality of life in Cornwall revealed through 2025 Vital Signs Report 27 weeks 1 day agoBook page
251010 | Cornwall backs 20mph rollout; St Austell's the only town to reject the plans 27 weeks 2 days agoBook page
250930 | Cornwall’s 20 mph speed limits have made the roads much safer 28 weeks 5 days agoBook page