Sourcing the Equipment - Twelve Drummers

Eventually a suitable programmable unit (“the brains”) was acquired, an old industrial computer, known as a Programmable Logic Controller (“PLC” for short), now made redundant after about 15 years of 24/7 active service, but still in good working order. Yes, even working computers get made redundant these days!

This PLC would be able to hold all the “actions” in a sequential program and switch relays on and off as required.

Relays were necessary to switch the light elements on and off as the PLC outputs had only a low voltage capability (24v) and could not switch “Mains” equipment directly . These “interposing relays” were to be used between the PLC outputs and the 230V AC rope lighting elements to do the on/off switching as directed by the PLC’s program.

 

 

Once all the other parts (relays, bases, protective units, power supplies, cable etc., and also a large weatherproof box to put it all in) were ordered and received, “the build” could begin.

However, a month had now slipped by, and there were only four weeks left to accomplish assembly, wiring, PLC programming, test/debugging, and finally installing onsite, so it would need to be “full steam ahead” from now on if the deadline was to be met. Picture 5 – The PLC controller, a miniature relay and relay in base
Picture 5 – The PLC controller, a miniature relay and relay in base

Contributions by GordonG

TitleUpdatedType
Installing Onsite - Twelve Drummers 14 years 47 weeks agoBook page
Final Fitting - Twelve Drummers 14 years 47 weeks agoBook page
Wiring the Components - Twelve Drummers 14 years 47 weeks agoBook page
Unit Design - Twelve Drummers 14 years 47 weeks agoBook page
Design & Equipment - Twelve Drummers 14 years 47 weeks agoBook page
First Impressions - Twelve Drummers 14 years 47 weeks agoBook page
Backplate Assembly - Twelve Drummers 14 years 47 weeks agoBook page
Sourcing the Equipment - Twelve Drummers 14 years 47 weeks agoBook page
The Call to Arms! - Twelve Drummers 14 years 47 weeks agoBook page
Program Chart - Twelve Drummers 14 years 47 weeks agoBook page
Bringing the Display to Life - Twelve Drummers 14 years 47 weeks agoBook page
Programming the PLC - Twelve Drummers 14 years 47 weeks agoBook page

Book page

TitleCreated
Approved with conditions | PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom... 10 weeks 4 days agoBook page
PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom, covered parking area below | As 11 weeks 3 days agoBook page
251027 | 20mph Monitoring—Hayle & St Ives Speed Data; Phase 3a-May-Jun 24 v Sep-Oct 24; Steamers Hill; Gwinear;Carbis;Nancledra 15 weeks 2 days agoBook page
PA25/07184 | Retention of 4no. existing holiday pods, swimming pool, incidental building, extended driveway and annexe converted 15 weeks 6 days agoBook page
251009 | Stark reality of life in Cornwall revealed through 2025 Vital Signs Report 17 weeks 6 days agoBook page
251010 | Cornwall backs 20mph rollout; St Austell's the only town to reject the plans 18 weeks 1 hour agoBook page
250930 | Cornwall’s 20 mph speed limits have made the roads much safer 19 weeks 3 days agoBook page
250905 - POSTPONED: Proposed resurfacing of Steamers Hill/Hatch's Hill that was due to happen end of July beginning of August 22 weeks 1 day agoBook page
250819 | Growing Links Penzance; Camborne Street Focus | Police Commissioner: Recovery and community safety stronger together 25 weeks 2 days agoBook page
250814 | Suspect Arrested - Millpond Avenue, Hayle - Assault [#495359232] - Devon and Cornwall Alert 26 weeks 8 hours agoBook page
250728 | Community Speedwatch Volunteers needed to help in Connor Downs and Hayle area - Devon and Cornwall Alert 28 weeks 3 days agoBook page
PA25/04174 | Overhead Electricity Lines application to add a third 11kv wire to an existing line | Land Adj To 17 Back Lane Anga 31 weeks 1 day agoBook page